INSPECTION
PROCEDURE
1. INSPECT SHIFT STROKE SENSOR
(a) Connect 3 new dry-cell batteries (1.5 V each) in series.
(b) Prepare a magnet or equivalent tool.
(c) Connect a positive (+) lead from the batteries to terminal 2 (VDD) and a
negative (-) lead to terminal 3 (GND).
*a